Izhora Plants completed the installation of the hydraulic cleaning reactor DS-302 at the oil refining complex TAIF-NK
Izhora Plants, part of the OMZ Group, completed contract obligations before TAIF-NK, JSC (The Republic of Tatrstan, Nizhnekamsk).
According to the contract, signed in November 2010, Izhora Plants committed itself (for the first time) not only to design and manufacture of petrochemical hydraulic cleaning reactor DS-302, but also to organize its delivery and installation to the designed position at the customer’s site.
Installation of the reactor was carried out by the service center of Izhora Plants, involving specialized installation company. The installation was performed on the grounds of workshop #4 of the oil refining plant of TAIF-NK, JSC. Reactor, weight – 212 tons, 4.800 meters in diameter and 15 meters in height, was set up on the foundation (to the working position). The reactors installation to the desired position was carried out simultaneously by two automotive cranes Liebherr, lifting capacity – 400 tons each. The work was carried out promptly and with impeccable quality.
“The first experience for Izhora Plants in an integrated approach to meet customer requirements for the supply of the petrochemical equipment was a success. We are convinced that only such approach will help us to compete confidently with the world’s leading manufacturers”, noted Ilya Kovalev, Deputy General Director for Sales and Logistics.
OMZ Group is one of the leading heavy industry companies specializing in engineering, production, sales and service support of equipment for nuclear, oil and gas, mining industries, as well as special steel production and industrial services. OMZ Group’s facilities are located in Russia and Czech Republic. The Group is controlled by Gazprombank.
Комментарии могут оставлять только зарегистрированные (авторизованные) пользователи сайта.